Legal Assistance with Public Procurement for Tenderers and Contractors

Ivanova LLP Law Firm provides legal assistance under the Public Procurement Act (PPA) to Bulgarian and foreign economic operators, candidates, tenderers, and successful contractors in Burgas and throughout Bulgaria.

Our assistance covers the entire process – from analysing the procurement documentation and selecting an appropriate participation model to preparing the European Single Procurement Document (ESPD) and the tender, electronic submission through CAIS EPP, protection in the event of exclusion or a challenge, and performance of the contract. We work in Bulgarian, English, and French.

General information about the firm’s practice is available on the page legal assistance with public procurement.

Who may participate in a public procurement procedure?

A candidate or tenderer in a public procurement procedure may be a Bulgarian or foreign natural or legal person, an association of such persons, or another entity entitled to perform the relevant works, supply, or service under the legislation of the country in which it is established.

Participation may be organised in various ways:

  • Independent participation by a single natural or legal person.
  • Participation through an association or consortium.
  • Reliance on the capacities of third parties to satisfy particular selection criteria.
  • Use of subcontractors to perform part of the subject matter of the procurement.
  • Participation by foreign economic operators independently or jointly with local partners.

The choice of participation model affects the documents that must be submitted, the allocation of activities, the evidence of professional and technical capacity, and liability during performance of the contract.

Candidate, tenderer, and contractor – what is the difference?

The three terms refer to different capacities within the procedure. A candidate submits a request to participate in a procedure involving prior selection. A tenderer submits a tender or participates in negotiations. A contractor is the tenderer selected by the contracting authority with whom the public procurement contract is concluded.

Accurately identifying the capacity in which a person is acting is important because it determines the applicable requirements, the rights of participation and legal protection, and the documents that must be submitted.

Legal assistance throughout the participation process

A legal review is most useful before a request to participate or tender is submitted. At this stage, it is possible to identify unclear or restrictive conditions, excessive contractual risks, and requirements for which the tenderer does not have the necessary supporting evidence.

Preliminary analysis of the procurement documentation

Before deciding whether to participate, it is necessary to assess not only whether the company is capable of performing the subject matter of the procurement, but also whether it can demonstrate compliance with all stipulated conditions.

The legal analysis may cover:

  • The subject matter of the procurement and the individual lots.
  • The conditions and restrictions governing participation.
  • The mandatory or discretionary grounds for exclusion.
  • The selection criteria and the required supporting evidence.
  • The economic and financial standing requirements.
  • The technical and professional capacity requirements.
  • The technical specifications and conditions of performance.
  • The award criterion and evaluation methodology.
  • Time limits, guarantees, payments, liquidated damages, and liability.
  • The draft contract and the potential risks associated with its performance.

The technical assessment is carried out jointly with the client’s specialists, while the legal analysis focuses on whether the conditions comply with the law, whether the documentation is sufficiently clear, and what consequences it may have for the tenderer.

Clarifications and protection against restrictive conditions

Where the procurement documentation contains unclear, contradictory, or disproportionate requirements, the tenderer should promptly assess whether to request clarification, seek an amendment to the documentation, or use the statutory remedies available.

Our assistance may include:

  • Drafting questions and requests for clarification.
  • Analysing published responses and amendments to the procurement documentation.
  • Examining whether a particular requirement unjustifiably restricts competition.
  • Assessing the time limit and legal interest required to bring a challenge.
  • Preparing an appeal against a decision to open the procedure or another challengeable act.
  • Assessing whether participation remains economically and legally justified following amendments to the documentation.

A response after submission of the tender will often be too late where the disputed issue arises from a condition announced in advance. The procurement documentation should therefore be analysed immediately after its publication.

Independent participation, associations, third parties, and subcontractors

Where an economic operator cannot independently satisfy all requirements or perform the entire subject matter of the procurement, it may be appropriate to consider participating through an association, relying on the capacities of third parties, or using subcontractors.

Legal assistance may include:

  • Selecting an appropriate model for joint participation.
  • Preparing or reviewing an association agreement.
  • Allocating activities and responsibilities between the members.
  • Appointing the representative of the association.
  • Determining which criteria may be satisfied by relying on a third party.
  • Preparing commitments and supporting evidence from third parties.
  • Identifying the activities to be assigned to a subcontractor.
  • Reviewing the documents and ESPDs of association members, third parties, and subcontractors.

An association member, third party, and subcontractor each have a different role. Incorrectly identifying their capacity or submitting incomplete documents may create a risk that the participation will be found inadmissible.

Preparation of the ESPD, request to participate, and tender

The ESPD contains preliminary declarations concerning the personal circumstances of the economic operator and its compliance with the stipulated selection criteria. The information provided must be accurate, consistent, and aligned with the remaining parts of the request to participate or tender.

Our assistance may cover:

  • Completing or legally reviewing the ESPD.
  • Reviewing the declared grounds for exclusion.
  • Analysing measures taken to demonstrate reliability, where applicable.
  • Reviewing information concerning economic and financial standing.
  • Reviewing information concerning technical and professional capacity.
  • Preparing the documents of association members.
  • Reviewing the documents of third parties and subcontractors.
  • Legally reviewing the technical proposal.
  • Reviewing the financial proposal and the manner in which it is presented.
  • Ensuring consistency between the ESPD, technical proposal, financial proposal, and supporting documents.

The legal adviser does not prepare the client’s technical solution or price calculation on the client’s behalf. The adviser assists with their correct presentation and reviews their compliance with the procurement documentation and applicable requirements.

Confidential information and trade secrets

When preparing a tender, it may be necessary to protect technical, financial, or commercial information. Not all information, however, may lawfully be designated as confidential.

Legal assistance may include assessing which parts of the tender may be protected, drafting reasons supporting confidentiality, and reducing the risk of unlawfully designating information that must remain accessible under the applicable legislation.

Electronic submission through CAIS EPP

Requests to participate and tenders are submitted electronically through CAIS EPP. The technical use of the platform also has legal consequences concerning the submission deadline, format, signing, and content of the submitted documents.

Our assistance may include:

  • Arranging the documents in accordance with the structure of the procurement.
  • Reviewing the files and supporting documents before submission.
  • Reviewing the representative authority and electronic signatures.
  • Ensuring consistency between the fields completed on the platform and the attached documents.
  • Preparing for submission, amendment, supplementation, or withdrawal before the deadline.
  • Providing a legal assessment of the available actions in the event of a technical problem.
  • Preserving evidence of the actions taken and the problem encountered.

Practical information is also available in the article “Technical Issues in CAIS EPP During Public Procurement Procedures – What Are Your Legal Options?”.

Additional documents, clarifications, and written explanations

After submission of the request to participate or tender, the contracting authority or evaluation committee may request additional documents, evidence, or clarifications. The response must be prepared carefully without impermissibly amending the original proposal.

Legal assistance may include:

  • Analysing the request received and the deadline for responding.
  • Preparing and reviewing additional documents and supporting evidence.
  • Clarifying information contained in the ESPD or tender.
  • Reviewing consistency between the information originally declared and the documents subsequently submitted.
  • Preparing or reviewing a written explanation concerning the proposed terms.
  • Assessing the risk of exclusion arising from an incomplete or inappropriate response.

Evaluation, ranking, and exclusion

A public procurement contract is awarded on the basis of the most economically advantageous tender. Depending on the award criterion announced in advance, this may be determined on the basis of the lowest price, cost level, or the best price-quality ratio.

The evaluation committee and contracting authority must apply the conditions and methodology announced in the procurement documentation precisely. It is important for the tenderer to verify whether its tender was evaluated in accordance with the predetermined rules and whether the decision contains sufficiently clear reasons.

Legal assistance may include:

  • Analysing the minutes, report, and decision of the contracting authority.
  • Reviewing whether the evaluation methodology was applied correctly.
  • Analysing the points awarded and the reasons for the evaluation.
  • Reviewing the grounds for exclusion.
  • Comparing the committee’s findings with the documents submitted.
  • Assessing the lawfulness of the ranking.
  • Assessing the legal interest, applicable time limit, and prospects of a challenge.

The most common risks for candidates and tenderers

Even where a company has the necessary professional and technical capacity, an omission in the documents or an inconsistency between different parts of the tender may lead to exclusion.

Common risks include:

  • An incomplete or inconsistently completed ESPD.
  • A discrepancy between the ESPD and supporting evidence subsequently submitted.
  • Failure to satisfy a selection criterion.
  • The existence of a ground for exclusion.
  • Incorrect presentation of an association member, third party, or subcontractor.
  • A technical proposal that does not comply with the conditions announced in advance.
  • The inclusion of reservations, conditions, or alternatives not permitted by the procurement documentation.
  • An incorrectly structured or signed financial proposal.
  • An inconsistency between the financial and technical proposals.
  • A missed deadline or incorrect electronic submission.
  • Failure to submit a written explanation, or submission of an incomplete or unacceptable explanation.
  • Failure to respond promptly following a decision to exclude the tenderer.

If you have received a decision excluding you from the procedure, see also the practical article “Excluded from a Public Procurement Procedure: What to Check Before Filing an Appeal”.

Challenges and representation before the CPC and SAC

Depending on the stage of the procedure and the act being challenged, interested persons, candidates, or tenderers may have the right to bring an appeal. The decisions specified in the PPA may be challenged, as may actions or omissions that prevent access to or participation in the procedure.

Legal protection may include:

  • Analysing the procurement documentation, minutes, and decision.
  • Assessing the legal interest and admissibility of the appeal.
  • Reviewing the applicable time limit for bringing the challenge.
  • Preparing and submitting an appeal before the Commission for Protection of Competition.
  • Preparing an application for an interim measure where the statutory requirements are met.
  • Preparing written submissions, objections, and evidence.
  • Protecting an excluded or incorrectly ranked tenderer.
  • Protecting a ranked tenderer or successful contractor where a competitor brings an appeal.
  • Representation in proceedings before the CPC and the Supreme Administrative Court.

The time limits for legal protection in public procurement procedures are short and depend on the particular act, the notification date, and the method of publication. The decision and the procurement file should therefore be reviewed immediately after they are received.

Further information is available on the page “Appeals and Legal Protection in Public Procurement”.

Conclusion and performance of the contract

The selection of a tenderer as the successful contractor does not bring the legal risks to an end. Before the contract is signed, the required supporting evidence and guarantees must be submitted, and the consistency between the contract, the draft contained in the procurement documentation, and the proposals made in the tender must be reviewed.

Legal assistance may cover:

  • Reviewing the documents required before conclusion of the contract.
  • Assistance with demonstrating the absence of grounds for exclusion.
  • Reviewing the performance guarantee and other forms of security.
  • Legally reviewing the final wording of the contract.
  • Reviewing consistency between the procurement documentation, tender, and contract.
  • Assistance with accepting and documenting performance.
  • Advice concerning time limits, payments, guarantees, and liquidated damages.
  • Legal assistance in the event of delay, a dispute concerning quality, or refusal to accept performance.
  • Analysing the permissibility of a proposed amendment to the contract.
  • Assistance with termination of the contract or a contractual dispute.

An amendment to the contract is permissible only where an applicable statutory ground exists and its conditions are satisfied. Not every change to the time limit, price, quantity, or scope may lawfully be formalised through a supplementary agreement.

How we assist businesses

Legal assistance may be limited to a particular issue or may cover the entire participation and performance process.

  • Preliminary analysis: we review the procurement documentation and contractual risks before a decision to participate is made.
  • Preparation of documents: we assist with the proper preparation of the ESPD, requests to participate, tender, and supporting documents.
  • Working with the client’s team: we coordinate the legal aspects with the technical, financial, and commercial specialists.
  • Pre-submission review: we review the consistency of the documents, representative authority, and electronic signatures.
  • Risk assessment: we identify potential grounds for exclusion, challenge, or contractual dispute.
  • Procedural representation: we represent clients before the CPC and SAC.
  • Contractual support: we assist with the conclusion, performance, amendment, and termination of the contract.

A solicitor cannot guarantee ranking or selection as the successful contractor. The purpose of legal assistance is to ensure that participation is prepared lawfully and consistently and on the basis of a clear assessment of the risks.

Practical materials for tenderers and contractors

Consultation concerning a specific public procurement procedure

Are you preparing a request to participate or a tender, have you received a decision excluding you from the procedure, or are you about to conclude a contract? A timely legal review may reduce the risk of a procedural omission, a missed opportunity for legal protection, or a subsequent contractual dispute.

Send an enquiry for legal advice

Frequently Asked Questions

What is the difference between a candidate, tenderer, and contractor?

A candidate submits a request to participate in a procedure involving prior selection. A tenderer submits a tender or participates in negotiations. A contractor is the tenderer selected by the contracting authority with whom the public procurement contract is concluded.

Who may participate in a public procurement procedure?

A Bulgarian or foreign natural or legal person, association, or other entity entitled to perform the relevant works, supply, or service under the applicable legislation may participate in a public procurement procedure.

Can a solicitor review the procurement documentation before a tender is submitted?

Yes. The legal review may cover the selection criteria, grounds for exclusion, technical requirements, evaluation methodology, draft contract, and the available options for requesting clarification or challenging restrictive conditions.

Do you assist with completing and reviewing the ESPD?

Yes. Assistance may include completing or reviewing the ESPD, ensuring that the information corresponds to the selection criteria, and reviewing the documents of association members, third parties, and subcontractors.

How can a business participate through an association, third party, or subcontractor?

The particular model depends on the requirements of the procurement and the tenderer’s capacity. The roles, activities, and responsibilities must be clearly defined, and the required ESPDs, commitments, agreements, and supporting evidence must be submitted.

What can be done where the procurement documentation contains restrictive conditions?

Depending on the particular condition and the stage of the procedure, it may be possible to request clarification or an amendment or, where the required legal interest exists, to use the statutory appeal procedure. The documentation should be reviewed promptly because the time limits for legal protection are short.

What can be done following a decision to exclude a tenderer?

The decision, minutes, tender, and documents submitted by the tenderer should be analysed. Where there is sufficient legal interest and valid grounds, the decision may be appealed before the CPC within the applicable time limit, with subsequent judicial protection before the SAC.

Do you also provide assistance after the successful contractor has been selected?

Yes. Legal assistance may continue during submission of the required documents and guarantees, conclusion of the contract, acceptance of performance, payments, liquidated damages, permissible amendments, and any contractual disputes that arise.

The information on this page is general in nature and does not replace individual legal advice based on the particular procurement documentation, applicable legal framework, and circumstances of the relevant procedure.

Send us a message:
Thank You for contacting us! We will contact you as soon as possible!

To continue, you must agree with Privacy Policy of Ivanova LLP Law Firm

Please wait
Or contact us:
Social Media:
Working Hours:Mon - Fri - 9:00 am - 5:00 pm
map